| Sign In | Join Free | My spintoband.com |
|
All method statement for pipe installation wholesalers & method statement for pipe installation manufacturers come from members. We doesn't provide method statement for pipe installation products or service, please contact them directly and verify their companies info carefully.
| Total 392 products from method statement for pipe installation Manufactures & Suppliers |
|
|
|
Model Number:DN8-DN1200 Place of Origin:Cangzhou, China (Mainland) ... diameter pipe, make the line turning Angle Material Cast steel, alloy steel, stainless steel, copper, aluminum alloy, plastic, argon luo drain, PVC, PPR, etc Creation Method Pushing, pressing, forging, casting, etc Manufacturer's Standard ANSI, ISO, JIS, |
Hebei Lufeng Piping Equipment Co., Ltd.
Hebei |
|
|
Brand Name:Longway Place of Origin:China ...Pipe Ramming Hammer Applicable Industries Mining Product Description Whatever direction your work takes you, BAIWEI can handle it... From conventional horizontal pipe ramming to vertical pile driving. The BAIWEI pneumatic pipe ramming tool is used for the trenchless installation of steel pipe through a wide variety of soil types, without any rise or fall in the ground's surface. Some trenchless casing installation methods |
Langfang Baiwei Drill Co., Ltd.
Hebei |
|
|
Brand Name:HUATAO Model Number:HT-Thermal plastic Forming Tube- FIPP Place of Origin:CHINA ... the volume of a prefabricated liner pipe—using specialized deformation equipment—to approximately one-third of its original size. This reduced-volume liner is then drawn into the host pipeline using traction ... |
HUATAO LOVER LTD
Hebei |
|
|
Place of Origin:china ...Pipe Ductile Iron Wear Resistant For Steam Supply OVERVIEW This kind of pipe is able to bear huge jacking pressure. As well owns enough intensity to endure internal and external pressure. It also possesses perect characteristic of anti-corrosion and durability. In addition, the inherent flexibility enables it to adapt ground displacement. Pipe jacking is a trenchless method of new pipe installation Factory made pipe |
Henan Wein Industry Co., Ltd.
Henan |
|
|
Place of Origin:china ...Pipe Ductile Iron Wear Resistant For Steam Supply OVERVIEW This kind of pipe is able to bear huge jacking pressure. As well owns enough intensity to endure internal and external pressure. It also possesses perect characteristic of anti-corrosion and durability. In addition, the inherent flexibility enables it to adapt ground displacement. Pipe jacking is a trenchless method of new pipe installation Factory made pipe |
Henan Wein Industry Co., Ltd.
Henan |
|
|
Brand Name:TOBO Model Number:Threadolet Place of Origin:Shanghai, China METAL Forged Steel Pipe Threadolet A182 F52 F53 F55 1" 2" 3" 4" 3000LB 6000LB 9000LB sturdy olet Threaded Connection: Threadolet uses a threaded connection method, which facilitates quick installation and removal. Diverse Materials: ... |
TOBO STEEL GROUP CHINA
Shanghai |
|
|
Brand Name:Wellnit Model Number:ISO Place of Origin:China ...pipe beveling machine, pipe beveling machine, external clamp type automatic beveling machine. Product performance The external clamp beveling machine is designed for bevel processing of the end face of small diameter pipes in narrow workshops. Completely cold working method, external card positioning installation... |
Zhejiang Wellnit Mechanical Technology Co.,Ltd
Zhejiang |
|
|
Brand Name:WD Model Number:WD-45012 Place of Origin:China ...Pipe Clamp 1. Product detail : Standard of this clamp: clamp + sealing rubber ring. We choose 2.0mm plate for production. For connecting flanged metal pipes with a thickness of 2.0mm. Installation method: separately install the sealing rubber ring on the pipe on one side. Butt the other flanged pipe... |
SHIJIAZHUANG WOODOO TRADE CO.,LTD
Hebei |
|
|
Brand Name:CR Model Number:PPR PIPE Place of Origin:China ...Pipe White Red Color Pn20 Kitchen Water Supply System Tube Description List MPA(Pressure) Size(mm) Thinckness(mm) PN2.0 20 2.8 25 3.5 32 4.4 40 5.5 50 6.9 63 8.7 75 10.3 90 12.3 110 15.1 Advantages 1.Long Service Life 2.Corrosion Resistance 3.Good Flexibility 4.Excellent Shock Resistance 5.Good Wear Resistance 6.Small Flow Resistance 7.Good Environmental Performance 8.Safe and Reliable Connection Method Aplication Area PP-R pipe installation |
CHENGDU CHUANGRONG TRADING CO.,LTD
Sichuan |
|
|
Brand Name:CR Model Number:PPR PIPE Place of Origin:China ...Pipe White Red Color Pn20 Kitchen Water Supply System Tube Description List MPA(Pressure) Size(mm) Thinckness(mm) PN2.0 20 2.8 25 3.5 32 4.4 40 5.5 50 6.9 63 8.7 75 10.3 90 12.3 110 15.1 Advantages 1.Long Service Life 2.Corrosion Resistance 3.Good Flexibility 4.Excellent Shock Resistance 5.Good Wear Resistance 6.Small Flow Resistance 7.Good Environmental Performance 8.Safe and Reliable Connection Method Aplication Area PP-R pipe installation |
CHENGDU CHUANGRONG TRADING CO.,LTD
Sichuan |
|
|
Brand Name:WD Model Number:WD-201215326 Place of Origin:China ...Pipe Clamps Dust Collection Ductwork Clamps Product Detail: Different from the sealing ring of the standard clamp. This seal wraps all around the metal ferrule. The sealing performance at both ends of the connecting pipe is relatively good. The connection method is a quick opening method, which is convenient for installation... |
SHIJIAZHUANG WOODOO TRADE CO.,LTD
Hebei |
|
|
Brand Name:liwei Model Number:user-defined Place of Origin:Henan, China ... connection point between the pipeline and any other components in the system. One of the key advantages of using a Rubber Lined Pipe is its excellent corrosion resistance. The rubber coating provides a protective layer that helps prevent the buildup of |
Henan Liwei Industry Co., Ltd.
Henan |
|
|
Brand Name:HAIYANG Model Number:HWHP-250511 ... long-lasting performance, making them an ideal choice for water supply systems. With an installation method that can be either trenchless or open trench, these HDPE water supply pipes offer flexibility in deployment, allowing for ease of installation in |
Wuxi High Mountain Hi-tech Development Co.,Ltd
|
|
|
Brand Name:Lief Technology Model Number:W-20 Place of Origin:China ...pipe connector Product introduction The installation method of right angle vertical metal joint is somewhat similar to that of T-type straight joint. It only need one pair of M6 * 25 bolts to complete the installation process. The surface of right angle vertical joint can be provided with holes to further drive self-tapping screws to strengthen the fixation of the pipe... |
Lief Technology Company Limited
|
|
|
Brand Name:Lief Technology Model Number:W-12 Place of Origin:China ...straight joint. It only need one pair of M6 * 25 bolts to complete the installation process. The surface of right angle vertical joint can be provided with holes to further drive self-tapping screws to strengthen the fixation of the pipe and the joint. The |
Lief Technology Company Limited
|
|
|
Brand Name:Longway Place of Origin:China Model Number:BH610 ...Pipe Ramming with Main Machine Length 1320-4640mm Product Description: Pipe Ramming: Faster, Minimal Disruption, High Accuracy Pipe Ramming is a trenchless technology used in underground construction to install pipes with minimal disruption to the surrounding environment. It is a no-dig method that uses a pneumatic pipe hammer to drive the pipe... |
Langfang Baiwei Drill Co., Ltd.
Hebei |
|
|
Place of Origin:China Brand Name:CR Model Number:20-110mm ... Size Green PPR Pipe Fittings Tee With Easy Installation PPR Reducing Tee is used to divide the water flow into three ways. The socket welding method is connected with the fittings or pipes to facilitate installation. The raw materials are environmentally... |
CHENGDU CHUANGRONG TRADING CO.,LTD
Sichuan |
|
|
Place of Origin:China Brand Name:CR Model Number:20-110mm ... Size Green PPR Pipe Fittings Tee With Easy Installation PPR Reducing Tee is used to divide the water flow into three ways. The socket welding method is connected with the fittings or pipes to facilitate installation. The raw materials are environmentally... |
CHENGDU CHUANGRONG TRADING CO.,LTD
Sichuan |
|
|
Brand Name:Longway Place of Origin:China Model Number:BH420 ... steel pipes quickly and efficiently. This method is ideal for engineering rescue and tamping casing in a variety of construction projects. Application Pipe Ramming is widely used in the construction industry for engineering rescue and tamping casing. It |
Langfang Baiwei Drill Co., Ltd.
Hebei |
|
|
Brand Name:ZW Place of Origin:China ...PRODUCT PROFILE Dismantling joint is specially designed to provide an easy method of removing or installing any kind of flanged product in a pipeline, such as valves, pumps, flanged pipe fittings or other similar products. Final anchoring is ensured by ... |
Anhui Prosper Flow Technology Co., Ltd
Anhui |