Sign In | Join Free | My spintoband.com |
|
Categories | Substation Steel Structures |
---|---|
Brand Name: | JSHG |
Model Number: | HG-SS-10-750KV |
Certification: | ISO/CNAS/IAF/CA |
Place of Origin: | China |
MOQ: | One 40 HQ Container |
Price: | negotiation |
Payment Terms: | L/C, T/T or Western Union |
Supply Ability: | 3,000 Tons per month |
Delivery Time: | 2 weeks per container after PO/drawing/prepayment confirmed |
Packaging Details: | Covered by Plastic Wrap or Mat or according to client's requests. |
Application: | Electrical Power Transformer Substation / Switch Yard |
Voltage Grade: | 10-750KV |
Material: | Q235 , Q345 , Gr.50 , Gr.65 , SS400 , etc. |
Appearance Treatment: | Hot-dip galvanized / Painting |
Welding: | Complies with AWS D1.1 standard |
Connection Structure: | Overlap / Flange connection |
Company Info. |
Jiangsu hongguang steel pole co.,ltd |
Verified Supplier |
View Contact Details |
Product List |
Electrical Substation Industry Power Substation Steel Structures
Q235 , Q345
Specifications:
Application |
| |
Voltage Grade |
| |
Material |
| |
Wall thickness |
| |
Once Forming |
| |
Welding |
| |
Joint |
| |
Galvanization |
| |
Export Experiences |
| |
Advantages |
|
Product Details
Description:
The electrical substation steel structure is the main load
supporting structures of substation, so its quality has direct
relation with the safety and reliability of power grid operation.
Our company has 17 years' manufacturing experience as well as
advanced equipment, excellent technical staff and mature
technology, which will assure the welding quality of steel
structures, the galvanization quality and the firmness. Meanwhile,
we have a whole set of quality test equipment to determine the
physical properties and sizes of all steel structures, ensuring the
desirable quality of the whole electrical substation structures.
Pre-assembly
Quality Control Management
Terms and Conditions
1. Price Term: EXW, FOB, CFR or CIF.
2. MOQ: One 40FT Container.
3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight
before shipment. Other payment way can be negotiated.
4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.
5. Package: Normally wrapped by plastic bags or burlap cloth at the top and
bottom, or according to clients requirement.
Our Services
Please feel free to contact us!
![]() |