Sign In | Join Free | My spintoband.com
spintoband.com
Products
Search by Category
Wholesale Marketplace
Home > Real Estate >

Gangway Column E1 consists of main ladder, deck ladder and frame. It is applicable to 3000 DWT to 30000 DWT Jetty.

  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Gangway Column E1 consists of main ladder, deck ladder and frame. It is applicable to 3000 DWT to 30000 DWT Jetty.

    Gangway Column E1 consists of main ladder deck ladder and frame It is applicable to 3000 DWT to 30000 DWT Jetty



    Gangway column is a kind of marine access gangway for operators and crews to pass through ship and jetty safely in the process of oil tanker's berthing at habour. It is instead of traditional boarding device.


    To speed up the loading and unloading process and to ensure the safety of the loaders and crews, it is necessary to replace traditional ladder with gangway tower and gangway column.


    The boarding ladder consists of a standing column, telescopic ladder and other supplementary constructions. The telescopic ladder has the function of moving up and down, bending, slewing and the adjustment of the front ladder.


    Mechanical or hydraulic drive system is usually used as drive system for Gangway Tower. The hydraulic cylinder drives the main ladder and front ladder for the luffing and slewing. The slewing cylinder could be floating after connected with ship without counterweight.


    Many kinds of safe protector can be set according to client’s requirement in order to ensure the normal work of transmission mechanism. Explosive-proof electric-device can also be used base on the flash point of the oil.


    Inspection and acceptance test can be done by customer or well known survey company (Bureau Veritas, SGS, Lloyd's register, Det Norske Veritas etc.)


    Main features:

    • Hydraulic control telescopic ladder
    • Self-levelling steps adopting four-link mechanism, steps will keep in horizontal when the ladder changing in a range of minus 45 degrees to 60 degrees.
    • Hydraulic control luffing and rotating system, 180 degrees rotation
    • Wireless remote control
    • The triangle ladder and front ladder are connected with single point, so that the land wheel under triangle will still keep contacting with deck steadily and will not be influenced by bump of ship.
    • Bespoke jib crane install on the top of gangway.

    Selection guide for Gangway Column

    The selection of Gangway Column is mainly according to dock tonnage, tidal variation, jetty surface situation, cost performance, etc. Users must fill in the parameters form and submit to manufacturer for determining the envelope scope base on the dimension and load data of Gangway column.


    There are 3 types of gangway: E1,E2,E3


    Ordering parameters of Gangway Column
    DescriptionData
    Type
    Design ship typemax T/min T
    Dock elevationm
    Design /extreme high water levelm / m
    Design/ extreme low water levelm / m
    Distance between edge of jetty and center of Gangway Towerm
    Thickness of dock fenderm
    Distance between datum surface of tower bottom base and dock surfacem
    Site power380v 50Hz 3phases 5lines
    Explosive-proof grade
    Control mode
    Maximum design wind speedm/s
















    If you want to know

    (Manually operated marine loading arms) please click http://www.oilgas-equip.com/sale-12406664-manual-operated-marine-loading-arm-for-5-000-tons-300-000-tons-ship-adjustable-support-jack-drain-co.html


    (Electric-hydraulically powered marine loading arms Single pipeline)please click http://www.oilgas-equip.com/sale-12406727-electric-hydraulic-operated-marine-loading-arm-single-pipeline-sound-and-light-alarm-swivel-joint-el.html


    (Electric-hydraulically powered marine loading arms Double pipelines)please click http://www.oilgas-equip.com/sale-12447226-electric-hydraulically-powered-marine-loading-arms-double-pipelines-transit-lpg-ammonia-dangerous-me.html


    (LNG and cryogenic marine loading arm) please click http://www.oilgas-equip.com/sale-12447230-lng-and-cryogenic-marine-loading-arm-operable-in-temperatures-196-c-delivery-pressures-45-bar.html


    (Tank truck & Railcar Top loading arms single pipeline) please click http://www.oilgas-equip.com/supplier-375641-tank-truck-railcar-top-loading-arms-single-pipeline


    (Top loading arm with vapour return pipeline) please click http://www.oilgas-equip.com/supplier-375640-top-loading-arm-with-vapour-return-pipeline


    (Tank truck & Railcar Bottom loading arms with single pipeline) please click http://www.oilgas-equip.com/supplier-375643-tank-truck-railcar-bottom-loading-arms-with-single-pipeline​


    (Bottom loading arm with vapour return pipeline) please click http://www.oilgas-equip.com/supplier-376895-bottom-loading-arm-with-vapour-return-pipeline


    (LNG Tank truck loading arms) please click http://www.oilgas-equip.com/sale-12358045-lng-tank-truck-cryogenic-loading-arms-nitrogen-purging-system-swivel-joints-international-cryogenic.html


    (Laser dock monitoring system) please click http://www.oilgas-equip.com/sale-12514598-laser-dock-monitoring-system-ldms-and-environment-monitoring-system-and-mooring-load-monitoring-syst.html


    (Skid mounted metering loading/unloading system) please click http://www.oilgas-equip.com/sale-12460261-lpg-skid-mounted-metering-unlading-control-system.html


    (LNG skid mounted metering system) please click http://www.oilgas-equip.com/sale-12462403-cryogenic-lng-skid-mounted-land-loading-measuring-system.html


    (Gangway tower) please click http://www.oilgas-equip.com/sale-12413414-e4-gangway-large-heavy-duty-tower-include-main-ladder-rotatable-platform-lifting-mechanism-20000dwt-.html


    (Gangway column) please click http://www.oilgas-equip.com/supplier-376891-gangway-column


    (Jib crane) please click http://www.oilgas-equip.com/sale-12424139-jib-crane-is-liquid-petrochemical-wharf-project-this-fixed-hydraulic-explosion-proof-crane-0-5t-to-3.html


    (Quick release mooring hook) please click http://www.oilgas-equip.com/sale-12465644-quick-release-mooring-hook-remote-release-system-intelligent-towing-hook-release-mechanism.html

    Quality Gangway Column E1 consists of main ladder, deck ladder and frame. It is applicable to 3000 DWT to 30000 DWT Jetty. for sale
    Send your message to this supplier
     
    *From:
    *To: Shanghai Eminent Tysun Engineering Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0

    Friendly Links: www.everychina.com

    Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

    Copyright © 2009 - 2024 spintoband.com. All rights reserved.